Category: | A track or path other than a cycleway mainly for walking: A problem that needs to be fixed |
Tags: | diversion, esplanadecarpark, floodprevention, heighrestrictions, ncn65, ouse, riverside, transpenninetrail, upstands, york |
Date time: | 1.13pm, Wednesday 24th March, 2021 |
Time line: | Earlier | Later |
Facing: | South |
Added by: | rebba |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Credit: | Rebba |
Area: | Haxby |
[Image taken 24.3.21] The cycle symbols on the route out of Esplanade carpark, York, have worn away. There are two lots of 3.5cm untapered solid metal upstands across the full width of the route (part of flood prevention measures), height restrictions (visible on the right, there is also one on the left-hand one), and no direction signage confirming cyclists are expected/permitted to be here. See also: #166177, #166178, #166179, #166180, #166182, #166183, #166256
Comments reflect the views of the original submitter only.